Home
Permits
Highway Permits
Access Permits
Excavation Permits
Regulations
Access Management Regulations
Download Entire Access PDF
Browse Access On The Web
Storm Water Rules and Regulations (SWRR)
Download Entire SWRR PDF
Browse SWRR On The Web
Subdivision Regulations
Projects
Photo Gallery
Annual Report
FAQ's
Links
Contact Us
Site Map
Best With:
Netscape Help:
Adobe Reader:
Flash Player:
Erie County Engineer's Office
Storm Water Rules and Regulations (SWRR)
Version: December, 1994
Table of Contents
CHAPTER
SEC.
DESCRIPTION
PAGE
ONE
GENERAL PROVISIONS
1
1.10
Authority and Title
1
1.20
Purpose
1
1.30
Scope
1
1.31
Requirements
2
1.32
Waivers
3
1.40
Plan Review
3
1.41
Permits
3
1.42
Fees
4
1.43
Assurance of Completion
5
1.50
Inspection and Compliance
5
1.51
Stormwater and Sediment Complaint
6
1.60
Relationship to Subdivision Regulations
6
1.61
Severability
7
TWO
STORMWATER RUNOFF CONTROL
8
2.00
Purpose
8
2.10
Calculating Stormwater Runoff
8
2.20
Stormwater Runoff Control Criteria
9
2.30
Runoff Control Methods
9
2.40
Maintenance of Stormwater Drainage Facilities and Control Structures
10
2.50
Preparing a Stormwater Management Plan
10
2.50.1
Data Collection
10
2.50.2
Runoff Calculations Before Development
11
2.50.3
Data Analysis
11
2.50.4
Drainage System Development
12
2.50.5
Plan for Runoff Control
13
2.50.6
Develop Design Details
14
2.60
Preparing a Drainage Plan
14
2.60.1
Data Collection
14
2.60.2
Runoff Calculations Before Development
15
2.60.3
Runoff Calculation and Control Criteria
15
2.60.4
Plan for Runoff Control
15
2.60.5
Develop Design Details
15
2.70
Submission of a Drainage Plan
15
Stormwater Control Plans Checklist
16
THREE
EROSION AND SEDIMENT CONTROL MEASURES
17
3.00
Plan Development Criteria
17
APPENDIX A
DEFINITIONS
20
APPENDIX B
APPLICATION AND PERMIT FORMS
23
Permit Application
24
Stormwater and Erosion Control Permit
26
APPENDIX C
SAMPLE SITE PLAN FOR A PERMIT REQUIRING
27
NEITHER A
MANAGEMENT OR DRAINAGE PLAN
APPENDIX D
QUICK DETENTION
28
Quick Detention
29
APPENDIX E
STORM SEWERS
30
Storm Sewers
31
Special Drainage Structures
35
S-7
STORM PIPE AND PIPE SPECIALS
37
General
37
Pipe and Fittings - Type and Kind
38
Joints
38
Pipe Fittings - Inspection and Rejection
39
Testing
39
APPENDIX F
CHECKLIST
40
Site Plan Checklist
41
Send email to the
Erie County Webmaster
with questions or comments about this web site.
Website Policies
-
Resident Resources
-
Site Map
-
Plug-Ins
-
Web Accessibility
Last modified: March 04, 2008